511 1ST STREET, MINNEAPOLIS | 2010

511 Main Switch
511 1st Street, Minneapolis
Clearwire
Main Back Haul Switch
3/4/10
Sleeth Tower installed the Main Back Haul Switch consisting of six Dragonwave dishes and three Eband dishes. This scope of work included 1800 linear feet of 1-5/8 Andrews coax installed in 4” metal Conduits and over 1800 feet of fiber optic cabling and DC power, supporting migration, and assisting in RF design.
