244 WACKER DRIVE, CHICAGO | 2013

Mark Reality
244 Wacker Drive, Chicago
Sprint Network Vision
6 High Capacity Sector Site
244 WACKER DRIVE, CHICAGO 7/13/13
Sleeth Tower general contracted this six sector high capacity site in downtown Chicago. Engineering was performed on upper Wacker Drive for the crane lift. This lift involved a street closure coordinated with the Chicago Police Department diverting six lanes of traffic around the lift.
This Hot Cut was completed at night with two MMBS and BBU cabinets installed with interlink conduits. This process involved decommissioning the existing Legacy and IDEN equipment before the new equipment could be installed, completed within a 72 hour window.
“Sprint NetVision in Chicago Illinois from 2011 to present. Their Company was very professional with both electrical and tower work preformed on this project. Construction dates were met without conflict, close out packages submitted in timely fashion with minimal to no corrections required.
I would recommend them for consideration on any upcoming project(s) you may encounter.”