244 WACKER DRIVE, CHICAGO | 2013

Sleeth Tower general contracted this six sector high capacity site in downtown Chicago.   Engineering was performed on upper Wacker Drive for the crane lift.  This lift involved a street closure coordinated with the Chicago Police Department diverting six lanes of traffic around the lift.  

This Hot Cut was completed at night with two MMBS and BBU cabinets installed with interlink conduits.  This process involved decommissioning the existing Legacy and IDEN equipment before the new equipment could be installed, completed within a 72 hour window.