511 1ST STREET, MINNEAPOLIS | 2010

Sleeth Tower installed the Main Back Haul Switch consisting of six Dragonwave dishes and three Eband dishes.  This scope of work included 1800 linear feet of 1-5/8 Andrews coax installed in 4” metal Conduits and over 1800 feet of fiber optic cabling and DC power, supporting migration, and assisting in RF design.

Pages: 1 2 3 4 5 6 7 8 9 10